I’ve requested a street sign for Manu Marble Way and I’m told this will be installed by the developer within the next two weeks.
It’s important for residents as they have experienced difficulties with deliveries – more of an issue during the lockdown with more home deliveries.
I’m also requesting a sign for Neven Place, which is in the same development.